2024
- TransnetBW GmbH
Support in regional planning
2023
- Thyssengas GmbH
Study of the influence of an external pipeline on a Thyssengas pipeline by calculating the pipeline potential induced by inductive influence for normal operation, fault conditions, and AWE pause times in accordance with DVGW GW 22 and VDE 0845-8
2022
- Amprion GmbH
Calculation of inductive high-voltage interference from HVDC cable systems on the A-North route, particularly on pipeline systems, in order to assess personal safety (in the event of a cable system fail)
2021
- VSB Neue Energien Deutschland GmbH
Verification of the design of the cable from the wind farm’s switching station to the substation (more)
- SB Neue Energien Deutschland GmbH
Calculation of the maximum feed-in power at 110 kV grid interconnection point (more)
2020
- B+S Grid Solutions, InnoVent Planungs GmbH & Co. KG
Loss calculation for the Schwennenz wind farm (more)
- Westfalen Weser Netz GmbH, EWE Netz GmbH, EAM Netz GmbH, wesernetz Bremen GmbH
Thermal dimensioning of the earthing conductors between transformer tank and earthing bar (more)
- TransnetBW GmbH
Development of an evaluation tool for INTEGRAL Time Series Simulations (more)
- FP Lux Solar GmbH & Co. Krempendorf KG
Consulting for plant certification Krempendorf III (more)
2019
- TransnetBW GmbH
Support in regional target network planning for 2030 (more)
- TransnetBW GmbH
Network reinforcement of the Badische Rheinschiene (more)