News
Verification of the design of the cable from the wind farm’s switching station to the substation
The cable from the switching station a wind farm to a substation in Hessia passes through two areas where cable clustering occurs. Due to their thermal interaction, these cable clusters result in a reduction of the continuous current carrying capacity. The aim of the project was to verify whether the Read more…