GRIDSIDE Energy Consult
  • Services
    • Network analyses & studies
      • Stability investigations
      • Cable sizing and calculations
      • Transient investigations
    • Grid optimization & development
      • Cable sizing and calculations
      • Conversion planning
      • Interference Studies
    • Consulting
      • Interference Studies
    • Project management
      • Conversion planning
    • Trainings & Workshops
  • References
  • News
  • Company
    • About us
    • Job offers
  • Contact
  • en
    • de

News

News

Verification of the design of the cable from the wind farm’s switching station to the substation

The cable from the switching station a wind farm to a substation in Hessia passes through two areas where cable clustering occurs. Due to their thermal interaction, these cable clusters result in a reduction of the continuous current carrying capacity. The aim of the project was to verify whether the Read more…

By Falko Nofz, 1 year25.11.2021 ago
Windpark mit Straße
News

Calculation of the maximum feed-in power at 110 kV grid interconnection point

In the course of the planned repowering of a wind farm, a large part of the existing wind turbines at its 110 kV grid interconnection point will be dismantled and in return new, more powerful wind turbines will be erected. Some of the existing turbines will remain at this 110 Read more…

By Falko Nofz, 1 year25.11.2021 ago
Windpark mit Straße
News

Loss calculation for the Schwennenz wind farm

Within the scope of this project the electrical losses for the Schwennenz wind farm were calculated. It consists of three wind turbines with a total of 13 MW connected capacity. The basis are the power curves and calculated frequency distributions of the wind speeds. The calculation was done with the Read more…

By Falko Nofz, 2 years09.10.2020 ago
Ortsnetzstation
News

Thermal dimensioning of the earthing conductors between transformer tank and earthing bar

Within the framework of this project, GRIDSIDE, as part of a small working group of the distribution network operators Westfalen Weser Netz, EWE, Energienetz Mitte and Wesernetz, thermally dimensioned the earthing connection between the transformer tank and earthing bar in local network stations on the basis of a jointly developed Read more…

By Falko Nofz, 2 years09.10.2020 ago
News

Development of an evaluation tool for INTEGRAL Time Series Simulations

Within the scope of this project, GRIDSIDE developed an evaluation tool for INTEGRAL time series simulations (annual simulations). Without such a tool, the evaluation of time series calculations is very complex and often error-prone, as thousands of network states (up to 8,760) and a large number of operating resources have Read more…

By Falko Nofz, 3 years23.07.2020 ago
Solarpark Krempendorf III
News

Best Practice: GRIDSIDE as technical consultant for the grid connection of the solar park “Krempendorf III

We were asked by FP Lux Solar GmbH to act as technical consultant. In this context we attended a meeting with the responsible distribution grid operator to discuss the grid connection of the “Krempendorf III” PV park. Our assignment: To discuss the contents of a new data questionnaire (TR-8 questionnaire) Read more…

By Falko Nofz, 3 years26.03.2020 ago
News

Reinforcement “Badische Rheinschiene”

Within the scope of the project GRIDSIDE Energy Consult GmbH provided personnel support for the network planning department of TransnetBW GmbH. In particular, the task was to support TransnetBW in the reconstruction of the NEP project P49, the network reinforcement of the “Badische Rheinschiene”. The aim of the project is Read more…

By Mirko Danzmann, 3 years26.03.2020 ago
380-kV-Mast
News

Support in the regional target grid planning for 2030

The aim of this project was the target-grid planning for the planning area “Oberrhein” for the year 2030 within the framework of the strategic network planning of TransnetBW GmbH. One of the key aspects of the project was the preparation of consistent data sets including the modelling of the target Read more…

By Axel Friedrich, 3 years16.03.2020 ago
Search page
Archives
  • February 2023
  • November 2021
  • October 2020
  • July 2020
  • March 2020
  • Privacy Policy
  • Imprint
Follow us:   Follow us on LinkedIn! Follow us on XING!

Cookie-Zustimmung verwalten
Wir verwenden Cookies, um unsere Website und unseren Service zu optimieren.
Funktionale Cookies Always active
Der Zugriff oder die technische Speicherung ist unbedingt für den rechtmäßigen Zweck erforderlich, um die Nutzung eines bestimmten Dienstes zu ermöglichen, der vom Abonnenten oder Nutzer ausdrücklich angefordert wurde, oder für den alleinigen Zweck der Übertragung einer Nachricht über ein elektronisches Kommunikationsnetz.
Vorlieben
Die technische Speicherung oder der Zugriff ist für den rechtmäßigen Zweck der Speicherung von Voreinstellungen erforderlich, die nicht vom Abonnenten oder Nutzer beantragt wurden.
Statistiken
Die technische Speicherung oder der Zugriff, der ausschließlich zu statistischen Zwecken erfolgt. Die technische Speicherung oder der Zugriff, der ausschließlich zu anonymen statistischen Zwecken verwendet wird. Ohne eine Aufforderung, die freiwillige Zustimmung Ihres Internetdienstanbieters oder zusätzliche Aufzeichnungen von Dritten können die zu diesem Zweck gespeicherten oder abgerufenen Informationen allein in der Regel nicht zu Ihrer Identifizierung verwendet werden.
Marketing
Die technische Speicherung oder der Zugriff ist erforderlich, um Nutzerprofile zu erstellen, um Werbung zu versenden oder um den Nutzer auf einer Website oder über mehrere Websites hinweg zu ähnlichen Marketingzwecken zu verfolgen.
Manage options Manage services Manage vendors Read more about these purposes
Einstellungen anzeigen
{title} {title} {title}